File:Turbine Tower No 26 construction site - geograph.org.uk - 1027017.jpg
Turbine_Tower_No_26_construction_site_-_geograph.org.uk_-_1027017.jpg (640 × 480 pixels, file size: 70 KB, MIME type: image/jpeg)
Captions
Summary
[edit]DescriptionTurbine Tower No 26 construction site - geograph.org.uk - 1027017.jpg |
English: Turbine Tower No 26 construction site. At the end of May 2008 construction began on Turbine No 26 which is the most northern of all the Turbines on the Scout Moor Wind Farm.
In the picture above the bottom section of the Tower is being lowered into position on to the concrete base. 822776 696211 687214 633643 816937 696963 Turbine details: Tower Height: 60m Blade Length: 40m Total Max Height: 100m Manufacturer: Nordex Model: N80 |
Date | |
Source | From geograph.org.uk |
Author | Paul Anderson |
Attribution (required by the license) InfoField | Paul Anderson / Turbine Tower No 26 construction site / |
InfoField | Paul Anderson / Turbine Tower No 26 construction site |
Camera location | 53° 40′ 11″ N, 2° 16′ 01″ W | View this and other nearby images on: OpenStreetMap | 53.669650; -2.266900 |
---|
Object location | 53° 40′ 12″ N, 2° 16′ 00″ W | View this and other nearby images on: OpenStreetMap | 53.670100; -2.266700 |
---|
Licensing
[edit]This image was taken from the Geograph project collection. See this photograph's page on the Geograph website for the photographer's contact details. The copyright on this image is owned by Paul Anderson and is licensed for reuse under the Creative Commons Attribution-ShareAlike 2.0 license.
|
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 15:58, 23 February 2011 | 640 × 480 (70 KB) | GeographBot (talk | contribs) | == {{int:filedesc}} == {{Information |description={{en|1=Turbine Tower No 26 construction site At the end of May 2008 construction began on Turbine No 26 which is the most northern of all the Turbines on the Scout Moor Wind Farm. In the picture above the |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
_error | 0 |
---|