File:Turbine Tower No 25 undergoing final testing - geograph.org.uk - 754154.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Turbine_Tower_No_25_undergoing_final_testing_-_geograph.org.uk_-_754154.jpg(640 × 480 pixels, file size: 70 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: Turbine Tower No 25 undergoing final testing. On Sunday 6th of April 2008 Turbine No 25 began turning for the first time.

Technicians from the turbine manufacturer Nordex connected a laptop for the monitoring of more than 300 different parameters like temperature sensors, hydraulic sensors, pitch parameters, wind sensor set and power output. 754136 753998 696211 633643 696917

Turbine details: Tower Height: 60m Blade Length: 40m Total Max Height: 100m Manufacturer: Nordex

Model: N80
Date
Source From geograph.org.uk
Author Paul Anderson
Attribution
(required by the license)
InfoField
Paul Anderson / Turbine Tower No 25 undergoing final testing / 
Paul Anderson / Turbine Tower No 25 undergoing final testing
Camera location53° 39′ 58″ N, 2° 14′ 15″ W  Heading=0° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location53° 39′ 58″ N, 2° 14′ 15″ W  Heading=0° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

[edit]
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Paul Anderson
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current16:37, 19 February 2011Thumbnail for version as of 16:37, 19 February 2011640 × 480 (70 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Turbine Tower No 25 undergoing final testing On Sunday 6th of April 2008 Turbine No 25 began turning for the first time. Technicians from the turbine manufacturer Nordex connected a laptop for the

There are no pages that use this file.

Metadata