File:Turbine Tower Construction - geograph.org.uk - 621523.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Turbine_Tower_Construction_-_geograph.org.uk_-_621523.jpg(640 × 480 pixels, file size: 46 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: Turbine Tower Construction. Construction of the first of 26 turbine towers for the Scoutmoor Wind Farm got underway on Friday 19th November 2007.

These towers are huge at 60 metres high when complete to put it into perspective look at the size of the white transit van to the left of the picture! On the day the picture was taken a 22 metre section had yet to be added. 621442 621443 621558 621528 621541

Turbine details: Tower Height: 60m Blade Length: 40m Total Max Height: 100m

Manufacturer: Nordex Model: N80
Date
Source From geograph.org.uk
Author Paul Anderson
Attribution
(required by the license)
InfoField
Paul Anderson / Turbine Tower Construction / 
Paul Anderson / Turbine Tower Construction
Camera location53° 39′ 49″ N, 2° 14′ 54″ W  Heading=180° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location53° 39′ 47″ N, 2° 14′ 55″ W  Heading=180° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

[edit]
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Paul Anderson
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current07:26, 7 February 2011Thumbnail for version as of 07:26, 7 February 2011640 × 480 (46 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Turbine Tower Construction Construction of the first of 26 turbine towers for the Scoutmoor Wind Farm got underway on Friday 19th November 2007. These towers are huge at 60 metres high when complet

There are no pages that use this file.

Metadata