File:Turbine No 16 in Full Flight - geograph.org.uk - 855939.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Turbine_No_16_in_Full_Flight_-_geograph.org.uk_-_855939.jpg (640 × 480 pixels, file size: 53 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: Turbine No 16 in Full Flight. Turbine No 16 on Scout Moor, completed in March 2008,

is seen here in full flight during final testing before being commissioned.

622953 854085 696211 696963 687214 824546

Turbine details: Tower Height: 60m Blade Length: 40m Total Max Height: 100m Manufacturer: Nordex Model: N80 http://www.nordex-online.com/en/products-services/wind-turbines/n80-25-mw.html

Key Facts http://www.scoutmoorwindfarm.co.uk/keyfacts.html

Scout Moor Wind Farm Construction Picture Gallery https://www.geograph.org.uk/gallery/scoutmoor_wind_farm_construction_6568

Following a public inquiry held in 2004, planning consent was granted by the Secretary of State on the 25th May 2005 for the building of Scout Moor Wind Farm. Construction of the wind turbines began back in November 2007 at Turbine No 16. By June 2008 engineers had constructed 26 wind turbine towers and installed 78 turbine blades 450 metres above sea level on Scout Moor amid adverse weather conditions of thick fog,gale force winds,torrential rain,snow and ice during the winter months of 2008.

On the 25th of September 2008 dignitaries from across the North West were invited to the official opening of the Scout Moor wind farm. Children from Edenfield Primary School , who have enjoyed lessons based around the wind farm, were on hand to cut the ribbon at Turbine No 22.https://www.geograph.org.uk/photo/980311 Head Teacher at Edenfield Primary School, Janet Reidy, said: "It was superb for the children to be involved after all the work they had done about the wind farm in their lessons. I think they will all remember this in future years and now they know what it's like to be film stars with all the camera crews there!"

Richard Dibley, wind power development manager at Peel, said at the opening: "We have welcomed people here today to thank them for their patience and understanding during the construction period and for them to see the wind farm in action at close quarters. I think we have chosen the perfect site here as it is more than 50% windier up here than it is in the surrounding area. These turbines will be generating power for years to come using a natural resource that will never run out."
Date
Source From geograph.org.uk
Author Paul Anderson
Attribution
(required by the license)
InfoField
Paul Anderson / Turbine No 16 in Full Flight / 
Paul Anderson / Turbine No 16 in Full Flight
Camera location53° 39′ 42″ N, 2° 15′ 04″ W  Heading=67° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location53° 39′ 46″ N, 2° 14′ 54″ W  Heading=67° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

[edit]
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Paul Anderson
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current03:49, 21 February 2011Thumbnail for version as of 03:49, 21 February 2011640 × 480 (53 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Turbine No 16 in Full Flight Turbine No 16 on Scout Moor, completed in March 2008, is seen here in full flight during final testing before being commissioned. 622953 854085 696211

There are no pages that use this file.

Metadata