File:The Final Turbine Tower Delivery to Scout Moor - geograph.org.uk - 1120689.jpg
The_Final_Turbine_Tower_Delivery_to_Scout_Moor_-_geograph.org.uk_-_1120689.jpg (640 × 480 pixels, file size: 67 KB, MIME type: image/jpeg)
Captions
Summary
[edit]DescriptionThe Final Turbine Tower Delivery to Scout Moor - geograph.org.uk - 1120689.jpg |
English: The Final Turbine Tower Delivery to Scout Moor. On Saturday the 31st of May 2008, as passers by looked on, the last of the twenty six turbine towers was delivered to the Scout Moor Wind Farm construction site.
Seen here on Market Street in the centre of the village of Edenfield it was almost 6 months to the day since the first tower sections were delivered back in November 2007.https://www.geograph.org.uk/photo/621442 The tower sections in the picture were for Turbine Tower No 17 which was constructed during the first week of June 2008. Following a public inquiry held in 2004, planning consent was granted by the Secretary of State on the 25th May 2005 for the building of Scout Moor Wind Farm. Construction of the wind turbines began back in November 2007 at Turbine No 16. By June 2008 engineers had constructed 26 wind turbine towers and installed 78 turbine blades 450 metres above sea level on Scout Moor amid adverse weather conditions of thick fog, gale force winds, torrential rain, snow and ice during the winter months of 2008. On the 25th of September 2008 dignitaries from across the North West were invited to the official opening of the Scout Moor wind farm. Children from Edenfield Primary School, who have enjoyed lessons based around the wind farm, were on hand to cut the ribbon at Turbine No 22.https://www.geograph.org.uk/photo/980311 Head Teacher at Edenfield Primary School, Janet Reidy, said: "It was superb for the children to be involved after all the work they had done about the wind farm in their lessons. I think they will all remember this in future years and now they know what it's like to be film stars with all the camera crews there!" Richard Dibley, wind power development manager at Peel, said at the opening: "We have welcomed people here today to thank them for their patience and understanding during the construction period and for them to see the wind farm in action at close quarters. I think we have chosen the perfect site here as it is more than 50% windier up here than it is in the surrounding area. These turbines will be generating power for years to come using a natural resource that will never run out." 696211 822989 687214 754370 809424 696963 989899 Turbine details: Tower Height: 60m Blade Length: 40m Total Max Height: 100m Manufacturer: Nordex Model: N80 http://www.nordex-online.com/en/products-services/wind-turbines/n80-25-mw.html |
Date | |
Source | From geograph.org.uk |
Author | Paul Anderson |
Attribution (required by the license) InfoField | Paul Anderson / The Final Turbine Tower Delivery to Scout Moor / |
InfoField | Paul Anderson / The Final Turbine Tower Delivery to Scout Moor |
Camera location | 53° 40′ 12″ N, 2° 18′ 18″ W | View this and other nearby images on: OpenStreetMap | 53.670010; -2.305000 |
---|
Object location | 53° 40′ 12″ N, 2° 18′ 18″ W | View this and other nearby images on: OpenStreetMap | 53.670010; -2.305000 |
---|
Licensing
[edit]This image was taken from the Geograph project collection. See this photograph's page on the Geograph website for the photographer's contact details. The copyright on this image is owned by Paul Anderson and is licensed for reuse under the Creative Commons Attribution-ShareAlike 2.0 license.
|
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 01:47, 25 February 2011 | 640 × 480 (67 KB) | GeographBot (talk | contribs) | == {{int:filedesc}} == {{Information |description={{en|1=The Final Turbine Tower Delivery to Scout Moor On Saturday the 31st of May 2008, as passers by looked on, the last of the twenty six turbine towers was delivered to the Scout Moor Wind Farm construc |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
_error | 0 |
---|