File:TRTS Route Map after Jul, 2015.svg
From Wikimedia Commons, the free media repository
Jump to navigation
Jump to search
Size of this PNG preview of this SVG file: 624 × 494 pixels. Other resolutions: 303 × 240 pixels | 606 × 480 pixels | 970 × 768 pixels | 1,280 × 1,013 pixels | 2,560 × 2,027 pixels.
Original file (SVG file, nominally 624 × 494 pixels, file size: 2.47 MB)
File information
Structured data
Captions
DescriptionTRTS Route Map after Jul, 2015.svg |
中文:2015年藍線完全通車後的台北捷運營運路網圖 English: The route map of Metro Taipei after the Dingpu Station was opened. |
Date | |
Source |
Own work This vector image was created with Adobe Illustrator by v. |
Author | Lzmxya(討論|貢獻|維基百科用戶頁) |
Permission (Reusing this file) |
This file is licensed under the Creative Commons Attribution-Share Alike 3.0 Unported license.
|
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 03:59, 10 July 2015 | 624 × 494 (2.47 MB) | Lzmxya (talk | contribs) | {{Information |Description ={{zh|1=2015年藍線完全通車後的台北捷運營運路網圖}}{{en|1=The route map of Metro Taipei after the Dingpu Station was opened.}} |Source={{own}}{{adobe|v }} |Date=2015-7-10 11:53:00 |Author =[[User:Lzmxya|Lz... |
You cannot overwrite this file.
File usage on Commons
The following 2 pages use this file:
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Width | 624px |
---|---|
Height | 494.4px |