File:Sept 2012 - April 2013 Bright Angel Trailhead Area Rehabilitation 2307 (8047493619).jpg
Original file (4,288 × 2,848 pixels, file size: 1.9 MB, MIME type: image/jpeg)
Captions
Summary
[edit]DescriptionSept 2012 - April 2013 Bright Angel Trailhead Area Rehabilitation 2307 (8047493619).jpg |
Grand Canyon National Park: the Bright Angel Trailhead rehabilitation project began on September 4, 2012. The area will be under construction through April 2013. NPS Photo by Kristen M. Caldon. . During construction, the informal parking area near the trailhead and around the Bright Angel Lodge cabins will be closed.. . At times, Bright Angel Lodge guests only will be allowed to park in designated areas of the construction site; all permitted guests will be required to display a parking pass visible through their windshield.. . Cars parked in these permitted areas without a displayed pass will be subject to ticketing and towing. Passes will be provided to permitted guests upon check-in.. . Visitors wishing to access the Bright Angel Trail or other services along the rim are encouraged to park at Lot D – Backcountry Information Center; or, take the Village Shuttle Bus Route from parking lots A-C or parking lots located at the Grand Canyon Visitor Center.. . At all times, at least one route to the Bright Angel Trail will remain open. However, through December 2012, either the southwest trailhead or the northeast trailhead will be closed for construction.. . Fencing is located around the construction site and Rim Trail Detour signs are posted throughout for access to the Bright Angel Trail, Kolb and Lookout Studios, Rim Lodges, and Hermits Rest.. . A rim trail detour map is attached outlining the current closure. The map will be redistributed as route closures change.. . Work will include: a 90 car paved parking lot around the Bright Angel Lodge cabins; an ADA (Americans with Disabilities Act) accessible Rim Trail connection between the Hermits Rest Route Transfer shuttle bus stop and the Kolb Studio; reconstruction of stone masonry retaining walls near the Kolb Studio and near the southwest trailhead of the Bright Angel Trail; new restrooms and a meeting plaza with shade structures; and burial of utilities. |
Date | |
Source | Sept 2012 - April 2013 Bright Angel Trailhead Area Rehabilitation 2307 |
Author | Grand Canyon National Park |
Camera location | 36° 03′ 25.86″ N, 112° 08′ 35.6″ W | View this and other nearby images on: OpenStreetMap | 36.057183; -112.143223 |
---|
Licensing
[edit]- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
This image was originally posted to Flickr by Grand Canyon NPS at https://flickr.com/photos/50693818@N08/8047493619. It was reviewed on 21 November 2020 by FlickreviewR 2 and was confirmed to be licensed under the terms of the cc-by-2.0. |
21 November 2020
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 21:06, 21 November 2020 | 4,288 × 2,848 (1.9 MB) | Tm (talk | contribs) | Transferred from Flickr via #flickr2commons |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Camera manufacturer | NIKON CORPORATION |
---|---|
Camera model | NIKON D300 |
Exposure time | 1/400 sec (0.0025) |
F-number | f/10 |
ISO speed rating | 320 |
Date and time of data generation | 12:40, 26 September 2012 |
Lens focal length | 32 mm |
Image title | Grand Canyon National Park: the Bright Angel Trailhead rehabilitation project began on September 4, 2012. The area will be under construction through April 2013. NPS Photo by Kristen M. Caldon
During construction, the informal parking area near the trailhead and around the Bright Angel Lodge cabins will be closed. At times, Bright Angel Lodge guests only will be allowed to park in designated areas of the construction site; all permitted guests will be required to display a parking pass visible through their windshield. Cars parked in these permitted areas without a displayed pass will be subject to ticketing and towing. Passes will be provided to permitted guests upon check-in. Visitors wishing to access the Bright Angel Trail or other services along the rim are encouraged to park at Lot D – Backcountry Information Center; or, take the Village Shuttle Bus Route from parking lots A-C or parking lots located at the Grand Canyon Visitor Center. At all times, at least one route to the Bright Angel Trail will remain open. However, through December 2012, either the southwest trailhead or the northeast trailhead will be closed for construction. Fencing is located around the construction site and Rim Trail Detour signs are posted throughout for access to the Bright Angel Trail, Kolb and Lookout Studios, Rim Lodges, and Hermits Rest. A rim trail detour map is attached outlining the current closure. The map will be redistributed as route closures change. Work will include: a 90 car paved parking lot around the Bright Angel Lodge cabins; an ADA (Americans with Disabilities Act) accessible Rim Trail connection between the Hermits Rest Route Transfer shuttle bus stop and the Kolb Studio; reconstruction of stone masonry retaining walls near the Kolb Studio and near the southwest trailhead of the Bright Angel Trail; new restrooms and a meeting plaza with shade structures; and burial of utilities. |
Author | NPS photo by Kristen M. Caldon |
Short title | Sept 2012 - April 2013 Bright Angel Trailhead Area Rehabilitatio |
Orientation | Normal |
Horizontal resolution | 240 dpi |
Vertical resolution | 240 dpi |
Software used | Adobe Photoshop CS5.1 Windows |
File change date and time | 16:28, 26 September 2012 |
Exposure Program | Manual |
Exif version | 2.21 |
Date and time of digitizing | 12:40, 26 September 2012 |
APEX shutter speed | 8.643856 |
APEX aperture | 6.643856 |
APEX exposure bias | 0 |
Maximum land aperture | 3 APEX (f/2.83) |
Subject distance | 2 meters |
Metering mode | Spot |
Light source | Unknown |
Flash | Flash did not fire |
DateTime subseconds | 86 |
DateTimeOriginal subseconds | 86 |
DateTimeDigitized subseconds | 86 |
Color space | Uncalibrated |
Sensing method | One-chip color area sensor |
File source | Digital still camera |
Scene type | A directly photographed image |
Custom image processing | Normal process |
Exposure mode | Manual exposure |
White balance | Auto white balance |
Digital zoom ratio | 1 |
Focal length in 35 mm film | 48 mm |
Scene capture type | Standard |
Scene control | None |
Contrast | Normal |
Saturation | Normal |
Sharpness | Normal |
Subject distance range | Unknown |
IIM version | 108 |
Serial number of camera | 3104646 |
Lens used | 17.0-35.0 mm f/2.8 |
Rating (out of 5) | 0 |
Date metadata was last modified | 09:28, 26 September 2012 |
Unique ID of original document | 679CACB92441D7BDF94F338C8BC46D33 |