File:Second wind turbine brings Tooele Army Depot closer to net zero energy (26235948576).jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(6,000 × 3,375 pixels, file size: 2.18 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: A second wind turbine towers nearly 300 feet above the nearby Stirling solar array at Tooele Army Depot, Utah, March 22, 2016. The $6.5 million wind turbine project is scheduled to be complete later this year and begin generating power. The 1.5 megawatt solar array, consisting of 429 Stirling engine solar dishes spread across 15 acres, is scheduled to be fully operational in 2017.
Date Taken on 22 March 2016, 14:20
Source Second wind turbine brings Tooele Army Depot closer to net zero energy
Author U.S. Army photo by John Prettyman/released - U.S. Army Corps of Engineers Sacramento District

Licensing

[edit]
Public domain
This image or file is a work of a U.S. Army Corps of Engineers soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, the image is in the public domain.

English | italiano | Nederlands | پښتو | русский | sicilianu | slovenščina | Türkçe | українська | +/−


This image was originally posted to Flickr by USACE-Sacramento District at https://flickr.com/photos/52057813@N07/26235948576. It was reviewed on 12 October 2016 by FlickreviewR and was confirmed to be licensed under the terms of the United States Government Work.

12 October 2016

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current03:51, 12 October 2016Thumbnail for version as of 03:51, 12 October 20166,000 × 3,375 (2.18 MB)Vanished Account Byeznhpyxeuztibuo (talk | contribs)Transferred from Flickr via Flickr2Commons

There are no pages that use this file.

Metadata