English: Scout Moor Wind Turbine Construction. The top 22 metre 55 ton section of Turbine Tower No 16 is lowered gently into place early in the morning.
This was the very first tower to be constructed on Scout Moor but it would be February 2008 before the cranes returned and the blades were attached due to strong winds during the winter months. 623999 696211 633643 696917 777641 687214 Turbine details: Tower Height: 60m Blade Length: 40m Total Max Height: 100m Manufacturer: Nordex Model: N80 Key Facts http://www.scoutmoorwindfarm.co.uk/keyfacts.html Scout Moor Wind Farm Picture Gallery https://www.geograph.org.uk/gallery/scoutmoor_wind_farm_construction_6568 By June 2008 engineers had constructed 26 wind turbine towers and installed 78 turbine blades 450 metres above sea level on Scout Moor amid adverse weather conditions of thick fog, gale force winds,torrential rain,snow and ice during the winter months of 2008. Following a public inquiry held in 2004, planning consent was granted by the Secretary of State on the 25th May 2005 for the building of Scout Moor Wind Farm. On the 25th of September 2008 dignitaries from across the North West were invited to the official opening of the Scout Moor wind farm. Children from Edenfield Primary School, who have enjoyed lessons based around the wind farm, were on hand to cut the ribbon at Turbine No 22.https://www.geograph.org.uk/photo/980311 Head Teacher at Edenfield Primary School, Janet Reidy, said: "It was superb for the children to be involved after all the work they had done about the wind farm in their lessons. I think they will all remember this in future years and now they know what it's like to be film stars with all the camera crews there!" Richard Dibley, wind power development manager at Peel, said at the opening: "We have welcomed people here today to thank them for their patience and understanding during the construction period and for them to see the wind farm in action at close quarters. I think we have chosen the perfect site here as it is more than 50% windier up here than it is in the surrounding area. These turbines will be generating power for years to come using a natural resource that will never run out." |
Date | |
Source | From geograph.org.uk |
Author | Paul Anderson |
Attribution (required by the license) InfoField | Paul Anderson / Scout Moor Wind Turbine Construction / |
InfoField | Paul Anderson / Scout Moor Wind Turbine Construction |
Camera location | 53° 39′ 34″ N, 2° 15′ 37″ W | View this and other nearby images on: OpenStreetMap | 53.659420; -2.260200 |
---|
Object location | 53° 39′ 47″ N, 2° 14′ 59″ W | View this and other nearby images on: OpenStreetMap | 53.662950; -2.249600 |
---|
Licensing
[edit]This image was taken from the Geograph project collection. See this photograph's page on the Geograph website for the photographer's contact details. The copyright on this image is owned by Paul Anderson and is licensed for reuse under the Creative Commons Attribution-ShareAlike 2.0 license.
|
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 06:53, 7 February 2011 | 640 × 480 (27 KB) | GeographBot (talk | contribs) | == {{int:filedesc}} == {{Information |description={{en|1=Scout Moor Wind Turbine Construction The top 22 metre 55 ton section of Turbine Tower No 16 is lowered gently into place early in the morning. This was the very first tower to be constructed on Sco |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
_error | 0 |
---|