File:Scout Moor Wind Farm - geograph.org.uk - 670413.jpg
Scout_Moor_Wind_Farm_-_geograph.org.uk_-_670413.jpg (640 × 480 pixels, file size: 41 KB, MIME type: image/jpeg)
Captions
Summary
[edit]DescriptionScout Moor Wind Farm - geograph.org.uk - 670413.jpg |
English: Scout Moor Wind Farm. The first five towers to be built on Scout Moor.
From left to right Tower Nos 25 21 18 16 and 19. Turbine Towers 21 and 18 were completed in early January 2008. 669098 669122 669074 622953 624065 Turbine details: Tower Height: 60m Blade Length: 40m Total Max Height: 100m Manufacturer: Nordex Model: N80 Key Facts http://www.scoutmoorwindfarm.co.uk/keyfacts.html Scout Moor Wind Farm Picture Gallery https://www.geograph.org.uk/gallery/scout_moor_wind_farm_under_construction_6568 |
Date | |
Source | From geograph.org.uk |
Author | Paul Anderson |
Attribution (required by the license) InfoField | Paul Anderson / Scout Moor Wind Farm / |
InfoField | Paul Anderson / Scout Moor Wind Farm |
Camera location | 53° 39′ 43″ N, 2° 14′ 55″ W | View this and other nearby images on: OpenStreetMap | 53.662050; -2.248500 |
---|
Object location | 53° 39′ 45″ N, 2° 14′ 45″ W | View this and other nearby images on: OpenStreetMap | 53.662420; -2.245800 |
---|
Licensing
[edit]This image was taken from the Geograph project collection. See this photograph's page on the Geograph website for the photographer's contact details. The copyright on this image is owned by Paul Anderson and is licensed for reuse under the Creative Commons Attribution-ShareAlike 2.0 license.
|
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 23:11, 7 February 2011 | 640 × 480 (41 KB) | GeographBot (talk | contribs) | == {{int:filedesc}} == {{Information |description={{en|1=Scout Moor Wind Farm The first five towers to be built on Scout Moor. From left to right Tower Nos 25 21 18 16 and 19. Turbine Towers 21 and 18 were completed in early January 2008. 669098 [ |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
_error | 0 |
---|