File:San Agustine Bridge Malisik River Views1.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file (4,096 × 3,072 pixels, file size: 1.58 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]

San Agustine Bridge, Candaba in February, 2024 with P 91 million slope protection works at Malisik River Dike or channel of the Pampanga River Rio Grande in San Agustin, Candaba at the foot of majestic Mount Arayat (On May 21, 2016 Candaba’s P30 million San Agustin (Bomba) Bridge approach collapsed due to alleged poor engineering design. It was retrofitted and rehabilitated).

Licensing

[edit]
I, the copyright holder of this work, hereby publish it under the following license:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current08:15, 15 February 2024Thumbnail for version as of 08:15, 15 February 20244,096 × 3,072 (1.58 MB)Valenzuela400 (talk | contribs)Approaches
08:14, 15 February 2024Thumbnail for version as of 08:14, 15 February 20244,096 × 3,072 (1.8 MB)Valenzuela400 (talk | contribs)Center underside
08:14, 15 February 2024Thumbnail for version as of 08:14, 15 February 20244,096 × 3,072 (1.71 MB)Valenzuela400 (talk | contribs)Right side
08:13, 15 February 2024Thumbnail for version as of 08:13, 15 February 20243,072 × 4,096 (1.45 MB)Valenzuela400 (talk | contribs)Undersides
08:10, 15 February 2024Thumbnail for version as of 08:10, 15 February 20244,096 × 3,072 (1.58 MB)Valenzuela400 (talk | contribs)San Agustine Bridge, Candaba in February, 2024 with P 91 million slope protection works at Malisik River Dike or channel of the Pampanga River Rio Grande in San Agustin, Candaba at the foot of majestic Mount Arayat (On May 21, 2016 Candaba’s P30 million San Agustin (Bomba) Bridge approach collapsed due to alleged poor engineering design. It was retrofitted and rehabili...

There are no pages that use this file.