File:Prepped cables ready for the placement of negative return reactor installed for the new G02 substation by the LIRR 3rd Rail. (ESA-LIRR Force Account, 12-26-2017). (39652453451).jpg
Jump to navigation
Jump to search
Size of this preview: 800 × 583 pixels. Other resolutions: 320 × 233 pixels | 640 × 466 pixels | 1,024 × 746 pixels | 1,280 × 932 pixels | 2,560 × 1,865 pixels | 2,964 × 2,159 pixels.
Original file (2,964 × 2,159 pixels, file size: 1.45 MB, MIME type: image/jpeg)