File:Mobile Launcher for SLS being picked up by CT-2 in May 2018.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(2,048 × 1,365 pixels, file size: 726 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: Preparations are underway May 31, 2018, to move crawler-transporter 2 (CT-2) under the mobile launcher at NASA's Kennedy Space Center in Florida.
Date Taken on 31 May 2018
Source https://www.nasa.gov/content/mobile-launcher (image link)
Author NASA
Kim Shiflett    wikidata:Q117448892
 
Description photographer
Authority file
creator QS:P170,Q117448892

Licensing

[edit]
Public domain This file is in the public domain in the United States because it was solely created by NASA. NASA copyright policy states that "NASA material is not protected by copyright unless noted". (See Template:PD-USGov, NASA copyright policy page or JPL Image Use Policy.)
Warnings:

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current02:55, 1 April 2019Thumbnail for version as of 02:55, 1 April 20192,048 × 1,365 (726 KB)Huntster (talk | contribs){{Information |Description={{en|1=Preparations are underway May 31, 2018, to move crawler-transporter 2 (CT-2) under the mobile launcher at NASA's Kennedy Space Center in Florida.}} |Source=https://www.nasa.gov/content/mobile-launcher ([https://www.nasa.gov/sites/default/files/thumbnails/image/ksc-20180531-mobilelauncher_0.jpg image link]) |Date={{taken on|2018-05-31}} |Author=NASA/Kim Shiflett |Permission= |other_versions= }} == {{int:license-header}} == {{PD-USGov-NASA}} [[Category:Mobile...

Metadata