File:IvanpahControlProject2019.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(3,264 × 2,448 pixels, file size: 1.78 MB, MIME type: image/jpeg)

Captions

Captions

Ivanpah-Control power line in 2019, before replacement

Summary

[edit]
Description
English: Looking north along the Ivanpah-Control (I-C) 115 kV AC subtransmission line in 2019, shown passing under the 500 kV Pacific Direct Current Intertie (PDCI) and a 230 kV single circuit AC line behind the PDCI, in Blackrock, California, 36 line miles south of the Control substation. The I-C towers will be replaced with new taller towers, and new conductors higher off the ground.
Date
Source https://www.flickr.com/photos/blmcalifornia/52508712715/in/album-72157715019511542/
Author Southern California Edison

Licensing

[edit]
This image was originally posted to Flickr by blmcalifornia at https://flickr.com/photos/50976304@N07/52508712715. It was reviewed on 3 August 2023 by FlickreviewR 2 and was confirmed to be licensed under the terms of the Public Domain Mark.

3 August 2023

Public domain This image is a work of a Bureau of Land Management* employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, the image is in the public domain in the United States.
*or predecessor organization

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current22:18, 2 August 2023Thumbnail for version as of 22:18, 2 August 20233,264 × 2,448 (1.78 MB)ArcMath (talk | contribs)Uploaded a work by Southern California Edison from https://www.blm.gov/press-release/bureau-land-management-invites-public-input-proposed-transmission-line-improvements with UploadWizard

The following page uses this file:

Metadata