File:Gotthard Railway - Goeschenen signalbox.jpg
From Wikimedia Commons, the free media repository
Jump to navigation
Jump to search
Size of this preview: 800 × 533 pixels. Other resolutions: 320 × 213 pixels | 640 × 427 pixels | 1,024 × 683 pixels | 1,280 × 853 pixels | 2,560 × 1,707 pixels | 5,396 × 3,597 pixels.
Original file (5,396 × 3,597 pixels, file size: 6.43 MB, MIME type: image/jpeg)
File information
Structured data
Captions
Summary
[edit]DescriptionGotthard Railway - Goeschenen signalbox.jpg | The signalbox at the north portal of the Gotthard rail tunnel from 1882 remains in operation until 2021. Afterwards the new operations center south in Pollegio undertakes the control. The lighting in the tunnel is controlled in Pollegio already today. Switzerland, Nov 18, 2015. |
Date | |
Source | Gotthard Railway - Göschenen |
Author | Kecko from Rural area, Eastern Switzerland |
Camera location | 46° 39′ 56.1″ N, 8° 35′ 19.29″ E | View this and other nearby images on: OpenStreetMap | 46.665583; 8.588693 |
---|
Licensing
[edit]This file is licensed under the Creative Commons Attribution 2.0 Generic license.
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
This image was originally posted to Flickr by Kecko at https://flickr.com/photos/70981241@N00/22720400768. It was reviewed on 10 January 2016 by FlickreviewR and was confirmed to be licensed under the terms of the cc-by-2.0. |
10 January 2016
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 14:46, 10 January 2016 | 5,396 × 3,597 (6.43 MB) | NAC (talk | contribs) | {{Information |Description=The signalbox at the north portal of the Gotthard rail tunnel from 1882 remains in operation until 2021. Afterwards the new operations center south in Pollegio undertakes the control. The lighting in the tunnel is controlled... |
You cannot overwrite this file.
File usage on Commons
The following 2 pages use this file:
File usage on other wikis
The following other wikis use this file:
- Usage on en.wikipedia.org