File:Factory and industrial management (1891) (14781028822).jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(3,296 × 2,246 pixels, file size: 601 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English:

Identifier: factoryindustria35newy (find matches)
Title: Factory and industrial management
Year: 1891 (1890s)
Authors:
Subjects: Engineering Factory management Industrial efficiency
Publisher: New York (etc.) McGraw-Hill (etc.)
Contributing Library: Engineering - University of Toronto
Digitizing Sponsor: University of Toronto

View Book Page: Book Viewer
About This Book: Catalog Entry
View All Images: All Images From Book
Click here to view book online to see this illustration in context in a browseable online version of this book.

Text Appearing Before Image:
3, etc. As soon as the order gets under way, theworkmen know that the parts are for order 250 and the assemblerswill soon fix 250 in their minds, so that when it is desired to follow WORK WANTED AT ONCE To the Foreman of the Department. The following orders are ur-gfpptly r^^d^d. nive tlipm preferenpp nvpr all other nrrfpra W.M. Order # Piece Drawing Order # Piece Drawing: The Eng.Magazine FORM 8. REQUISITION FOR URGENT WORK. Up an order, any person looking for the parts that go to make up 250will have no great difficulty in finding them. A workman should always have at his floor the material that hecan commence upon as soon as he fiijishes the job on which he isworking. For a man to finish a job, go to his foreman for another,and then wait for the material, certainly does not assist in makingdividends for the manufacturer. In a large number of plants thework is such as will admit of a job ahead plan, which is in suc-cessful operation in a number of enterprises. The system can be used
Text Appearing After Image:
402 MAXIMUM PRODUCTION. 403 in conjunction with a time clock, by the introduction of an additionalcard rack which is to hold the job ahead tickets. When a foremangets the production order, he knows the operations necessary to com-plete the work as well as the men who will do the work, so that it isan easy matter to make out the time cards for the necessary opera-tions and place them in the proper pockets in the ^job ahead rack, atthe same time sending the material requisitions covering the work tothe stock room. When a man finishes the work he has in his machine,he takes his card from the jobs in operation rack, stamps it properlyand then takes the top card from his pocket in the job ahead rack,stamps it, sees what work it calls for, places it in the jobs in opera-tion rack; goes to his machine, finds the material ready for him, andgoes to work without losing much time unless he creeps to the clockand back, as is often done. To prevent this creeping, and in order to see to it that a w

Note About Images

Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original work.
Date
Source

https://www.flickr.com/photos/internetarchivebookimages/14781028822/

Author Internet Archive Book Images
Permission
(Reusing this file)
At the time of upload, the image license was automatically confirmed using the Flickr API. For more information see Flickr API detail.
Volume
InfoField
35
Flickr tags
InfoField
  • bookid:factoryindustria35newy
  • bookyear:1891
  • bookdecade:1890
  • bookcentury:1800
  • booksubject:Engineering
  • booksubject:Factory_management
  • booksubject:Industrial_efficiency
  • bookpublisher:New_York__etc___McGraw_Hill__etc__
  • bookcontributor:Engineering___University_of_Toronto
  • booksponsor:University_of_Toronto
  • bookleafnumber:408
  • bookcollection:torontoengineering
  • bookcollection:toronto
Flickr posted date
InfoField
30 July 2014



Licensing

[edit]
This image was taken from Flickr's The Commons. The uploading organization may have various reasons for determining that no known copyright restrictions exist, such as:
  1. The copyright is in the public domain because it has expired;
  2. The copyright was injected into the public domain for other reasons, such as failure to adhere to required formalities or conditions;
  3. The institution owns the copyright but is not interested in exercising control; or
  4. The institution has legal rights sufficient to authorize others to use the work without restrictions.

More information can be found at https://flickr.com/commons/usage/.


Please add additional copyright tags to this image if more specific information about copyright status can be determined. See Commons:Licensing for more information.
This image was originally posted to Flickr by Internet Archive Book Images at https://flickr.com/photos/126377022@N07/14781028822. It was reviewed on 10 September 2015 by FlickreviewR and was confirmed to be licensed under the terms of the No known copyright restrictions.

10 September 2015

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current16:20, 20 October 2022Thumbnail for version as of 16:20, 20 October 20223,296 × 2,246 (601 KB)SteinsplitterBot (talk | contribs)Bot: Image rotated by 90°
01:31, 10 September 2015Thumbnail for version as of 01:31, 10 September 20152,246 × 3,302 (609 KB) (talk | contribs)== {{int:filedesc}} == {{information |description={{en|1=<br> '''Identifier''': factoryindustria35newy ([https://commons.wikimedia.org/w/index.php?title=Special%3ASearch&profile=default&fulltext=Search&search=insource%3A%2Ffactoryindustria35newy%2F fin...

There are no pages that use this file.