File:Doubling completed - geograph.org.uk - 552026.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Doubling_completed_-_geograph.org.uk_-_552026.jpg(640 × 480 pixels, file size: 75 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: Doubling completed. Over the August Bank holiday period the work to re-double the Coventry - Leamington Spa line as far as Gibbet Hill was completed and commissioned. The work commenced almost one year earlier 229144 was finally completed! (The rubber paved area in the left hand track is a temporary installation to allow road-rail construction vehicles to change from road to rail operation & vice-versa).
Date
Source From geograph.org.uk
Author David Stowell
Attribution
(required by the license)
InfoField
David Stowell / Doubling completed / 
David Stowell / Doubling completed
Camera location52° 23′ 36″ N, 1° 30′ 58″ W  Heading=45° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location52° 23′ 36″ N, 1° 30′ 58″ W  Heading=45° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

[edit]
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: David Stowell
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.


File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current02:43, 6 February 2011Thumbnail for version as of 02:43, 6 February 2011640 × 480 (75 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Doubling completed Over the August Bank holiday period the work to re-double the Coventry - Leamington Spa line as far as Gibbet Hill was completed and commissioned. The work commenced almost one y

There are no pages that use this file.

Metadata