File:Defense.gov News Photo 980928-F-0881Z-504.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file (1,268 × 1,012 pixels, file size: 382 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents
Description
English: Combat engineers from the U.S. and Romanian Armies consult the blue prints as they erect a Mabey and Johnson bridge at Camp Demi near Kladanj, Bosnia and Herzegovina, on Sept. 28, 1998. The flooding Drinjaca river damaged the supports of the present bridge leading to the American army compound which was forced to close the gate used for multi-ton vehicle traffic. The construction of the bridge is a combined effort between the U.S. Army's Alpha Company, 40th Engineers 1st Platoon of Idar Oberstein, Germany; Alpha Company 20th Engineers 2nd Platoon, of Fort Hood, Texas; Brown and Root civilian contractors and Romanian Army Engineers. The engineers are deployed to Bosnia and Herzegovina to support Operation Joint Forge.
Date Taken on 28 September 1998
Source

This image was released by the United States Air Force with the ID 980928-F-0881Z-504 (next).
This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.


العربية  বাংলা  Deutsch  Deutsch (Sie-Form)  English  español  euskara  فارسی  français  italiano  日本語  한국어  македонски  മലയാളം  Plattdüütsch  Nederlands  polski  پښتو  português  русский  slovenščina  svenska  Türkçe  українська  简体中文  繁體中文  +/−

Author
English: Staff Sgt. Lisa Zunzanyika-Carpenter, U.S. Air Force
Permission
(Reusing this file)
Public domain
This image or file is a work of a U.S. Air Force Airman or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, the image or file is in the public domain in the United States.

العربية  беларуская (тарашкевіца)  català  čeština  Deutsch  English  español  eesti  فارسی  suomi  français  italiano  日本語  한국어  македонски  മലയാളം  မြန်မာဘာသာ  norsk bokmål  Plattdüütsch  Nederlands  polski  português  português do Brasil  русский  sicilianu  slovenčina  slovenščina  српски / srpski  svenska  Türkçe  українська  Tiếng Việt  中文(简体)  中文(繁體)  +/−

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current00:51, 25 August 2012Thumbnail for version as of 00:51, 25 August 20121,268 × 1,012 (382 KB)Slick-o-bot (talk | contribs){{Information |Description={{en|1=Combat engineers from the U.S. and Romanian Armies consult the blue prints as they erect a Mabey and Johnson bridge at Camp Demi near Kladanj, Bosnia and Herzegovina, on Sept. 28, 1998. The flooding Drinjaca river dama...

There are no pages that use this file.

Metadata