File:Crews Build Foundation for New I-85 Bridges over Yadkin River.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(3,968 × 2,232 pixels, file size: 4.53 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: The four green columns on the right side of the temporary work bridge represent the first above-ground foundation elements built for the new I-85 North bridge over the Yadkin River. The two green columns to the left of the temporary work bridge represent the first above-ground foundation elements built for the new I-85 South bridge over the river.
Date
Source https://www.flickr.com/photos/39320593@N03/5574525180/
Author NCDOTcommunications

Licensing

[edit]
w:en:Creative Commons
attribution
This file is licensed under the Creative Commons Attribution 2.0 Generic license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
This image was originally posted to Flickr by NCDOTcommunications at https://flickr.com/photos/39320593@N03/5574525180. It was reviewed on 25 April 2023 by FlickreviewR 2 and was confirmed to be licensed under the terms of the cc-by-2.0.

25 April 2023

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current05:34, 25 April 2023Thumbnail for version as of 05:34, 25 April 20233,968 × 2,232 (4.53 MB)Ser Amantio di Nicolao (talk | contribs)Uploaded a work by NCDOTcommunications from https://www.flickr.com/photos/39320593@N03/5574525180/ with UploadWizard

There are no pages that use this file.

Metadata