File:Construction zone preparation at track level in Grand Central Terminal to support the installation of two new escalators that will connect future LIRR passengers to the Biltmore Room. (CM014B 11-28-2017) (38734448542).jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description Construction zone preparation at track level in Grand Central Terminal to support the installation of two new escalators that will connect future LIRR passengers to the Biltmore Room. (CM014B 11-28-2017)
Date
Source Construction zone preparation at track level in Grand Central Terminal to support the installation of two new escalators that will connect future LIRR passengers to the Biltmore Room. (CM014B 11-28-2017)
Author MTA Capital Construction Mega Projects

Licensing

[edit]
w:en:Creative Commons
attribution
This file is licensed under the Creative Commons Attribution 2.0 Generic license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
This image was originally posted to Flickr by NYMTACC at https://flickr.com/photos/59595815@N03/38734448542 (archive). It was reviewed on 7 February 2018 by FlickreviewR 2 and was confirmed to be licensed under the terms of the cc-by-2.0.

7 February 2018

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current02:40, 7 February 2018Thumbnail for version as of 02:40, 7 February 2018640 × 480 (148 KB)Epicgenius (talk | contribs)Transferred from Flickr via Flickr2Commons

There are no pages that use this file.

Metadata