File:Construction begins with 'first bite' on foundation barrier wall at Center Hill Dam 120711-A-HL948-010.jpg
![File:Construction begins with 'first bite' on foundation barrier wall at Center Hill Dam 120711-A-HL948-010.jpg](https://upload.wikimedia.org/wikipedia/commons/thumb/9/98/Construction_begins_with_%27first_bite%27_on_foundation_barrier_wall_at_Center_Hill_Dam_120711-A-HL948-010.jpg/800px-Construction_begins_with_%27first_bite%27_on_foundation_barrier_wall_at_Center_Hill_Dam_120711-A-HL948-010.jpg?20150430055230)
Original file (4,288 × 2,848 pixels, file size: 7.14 MB, MIME type: image/jpeg)
Captions
Captions
Summary
[edit]DescriptionConstruction begins with 'first bite' on foundation barrier wall at Center Hill Dam 120711-A-HL948-010.jpg |
English: U.S. Army Corps of Engineers Nashville District and Bauer Foundation Corporation management and personnel pose for photos on a specialty drill rig July 11, 2012 during a “First Bite” ceremony to begin constructing a subsurface concrete wall as a barrier for potentially harmful seepage water moving beneath the earthen dam. (USACE photo by Fred Tucker) |
|||
Date | Taken on 11 July 2012 | |||
Source | https://www.dvidshub.net/image/623089 | |||
Author | Fred Tucker | |||
Location InfoField | LANCASTER, TN, US | |||
VIRIN InfoField |
|
|||
Posted InfoField | 12 July 2012, 17:17 | |||
Archive link InfoField | archive copy at the Wayback Machine |
Licensing
[edit]Public domainPublic domainfalsefalse |
![]() |
This file is a work of a U.S. Army soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, it is in the public domain in the United States.
العربية ∙ বাংলা ∙ català ∙ čeština ∙ Deutsch ∙ English ∙ español ∙ eesti ∙ فارسی ∙ suomi ∙ français ∙ hrvatski ∙ magyar ∙ Bahasa Indonesia ∙ italiano ∙ 日本語 ∙ 한국어 ∙ lietuvių ∙ македонски ∙ മലയാളം ∙ မြန်မာဘာသာ ∙ Nederlands ∙ polski ∙ português ∙ русский ∙ sicilianu ∙ српски / srpski ∙ Türkçe ∙ українська ∙ Tiếng Việt ∙ 中文(简体) ∙ 中文(繁體) ∙ +/− |
![]() |
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 05:52, 30 April 2015 | ![]() | 4,288 × 2,848 (7.14 MB) | Fæ (talk | contribs) | == {{int:filedesc}} == {{milim | description = {{en|1=U.S. Army Corps of Engineers Nashville District and Bauer Foundation Corporation management and personnel pose for photos on a specialty drill rig July 11, 2012 during a “First Bite” ceremony to... |
You cannot overwrite this file.
File usage on Commons
The following page uses this file:
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Camera manufacturer | NIKON CORPORATION |
---|---|
Camera model | NIKON D90 |
Exposure time | 1/500 sec (0.002) |
F-number | f/11 |
ISO speed rating | 400 |
Date and time of data generation | 10:18, 11 July 2012 |
Lens focal length | 24 mm |
Short title | 120711-A-HL948-010 |
Author | U.S. Army Corps of Engineers, Nashville District, Fred Tucker |
Headline | Construction begins with 'first bite' on foundation barrier wall at Center Hill Dam |
Image title | U.S. Army Corps of Engineers Nashville District and Bauer Foundation Corporation management and personnel pose for photos on a specialty drill rig July 11, 2012 during a "First Bite" ceremony to begin constructing a subsurface concrete wall as a barrier for potentially harmful seepage water moving beneath the earthen dam. (USACE photo by Fred Tucker) |
City shown | Lancaster |
Credit/Provider | U.S. Army |
Source | Digital |
Copyright holder | Public Domain |
Width | 4,288 px |
Height | 2,848 px |
Bits per component |
|
Pixel composition | RGB |
Orientation | Normal |
Number of components | 3 |
Horizontal resolution | 250 dpi |
Vertical resolution | 250 dpi |
Software used | Adobe Photoshop CS5.1 Windows |
File change date and time | 17:21, 11 July 2012 |
White point chromaticity |
|
Chromaticities of primarities |
|
Color space transformation matrix coefficients |
|
Y and C positioning | Co-sited |
Exposure Program | Not defined |
Exif version | 2.21 |
Date and time of digitizing | 10:18, 11 July 2012 |
Meaning of each component |
|
Image compression mode | 4 |
APEX shutter speed | 8.965784 |
APEX aperture | 6.918863 |
APEX exposure bias | 0 |
Maximum land aperture | 3.9 APEX (f/3.86) |
Metering mode | Pattern |
Light source | Unknown |
Flash | Flash did not fire, auto mode |
DateTime subseconds | 00 |
DateTimeOriginal subseconds | 00 |
DateTimeDigitized subseconds | 00 |
Supported Flashpix version | 1 |
Color space | Uncalibrated |
Sensing method | One-chip color area sensor |
File source | Digital still camera |
Scene type | A directly photographed image |
Custom image processing | Normal process |
Exposure mode | Auto exposure |
White balance | Auto white balance |
Digital zoom ratio | 1 |
Focal length in 35 mm film | 36 mm |
Scene capture type | Standard |
Scene control | Low gain up |
Contrast | Normal |
Saturation | Normal |
Sharpness | Normal |
Subject distance range | Unknown |
GPS tag version | 2.2.0.0 |
Serial number of camera | 3227784 |
Lens used | 18.0-105.0 mm f/3.5-5.6 |
Date metadata was last modified | 12:21, 11 July 2012 |
Unique ID of original document | xmp.did:20347F85A6CBE1119C89FDCB3C2A2FFA |
Keywords |
|
Province or state shown | TN |
Code for country shown | US |
Special instructions | Released
Leon Roberts U.S. Army Corps of Engineers, Nashville District leon.a.roberts@usace.army.mil via DVIDS |
Original transmission location code | U.S. Army |
Country shown | United States |