File:Camp Wellfleet Final EECA Figure 1-8.jpg
From Wikimedia Commons, the free media repository
Jump to navigation
Jump to search
Camp_Wellfleet_Final_EECA_Figure_1-8.jpg (800 × 580 pixels, file size: 142 KB, MIME type: image/jpeg)
File information
Structured data
Captions
Summary
[edit]DescriptionCamp Wellfleet Final EECA Figure 1-8.jpg |
English: Figure 1-8: Smoke Grenade Discovered During EE/CA. The text of the report states:
|
Date | |
Source | Final Former Camp Wellfleet Engineering Evaluation/Cost Analysis. Prepared by Foster Wheeler Environmental Corporation, May 2000, for U.S Army Engineering and Support Center, Huntsville, Alabama. |
Author | Foster Wheeler Environmental Corporation for U. S. government |
Licensing
[edit]Public domainPublic domainfalsefalse |
This work is in the public domain in the United States because it is a work prepared by an officer or employee of the United States Government as part of that person’s official duties under the terms of Title 17, Chapter 1, Section 105 of the US Code.
Note: This only applies to original works of the Federal Government and not to the work of any individual U.S. state, territory, commonwealth, county, municipality, or any other subdivision. This template also does not apply to postage stamp designs published by the United States Postal Service since 1978. (See § 313.6(C)(1) of Compendium of U.S. Copyright Office Practices). It also does not apply to certain US coins; see The US Mint Terms of Use.
|
||
This file has been identified as being free of known restrictions under copyright law, including all related and neighboring rights. |
https://creativecommons.org/publicdomain/mark/1.0/PDMCreative Commons Public Domain Mark 1.0falsefalse
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 15:09, 9 January 2023 | 800 × 580 (142 KB) | Jstuby (talk | contribs) | Uploaded a work by Foster Wheeler Environmental Corporation for U. S. government from Final Former Camp Wellfleet Engineering Evaluation/Cost Analysis. Prepared by Foster Wheeler Environmental Corporation, May 2000, for U.S Army Engineering and Support Center, Huntsville, Alabama. with UploadWizard |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.