File:CPM Network Diagram.jpg
Original file (739 × 638 pixels, file size: 74 KB, MIME type: image/jpeg)
Captions
Summary
[edit]DescriptionCPM Network Diagram.jpg |
English: Example of CPM Network Diagram
The critical path method (CPM) has proved a successful method for planning, organizing, and controlling projects. Initially, this management tool outlines the project graphically in the form of a network diagram. This representation, shown in Figure 12-3, illustrates:
CPM operations are referred to as activities. In Figure 12-3, an example of the application of CPM to the installation of a traffic control system, the activities necessary to complete the project are denoted by a line with an arrowhead. The circled numbers represent events which mark the beginning or completion of an activity. Dashed lines represent dummy activities which do not require any time but must be completed before another event can occur. The number below the activity represents the amount of time required to complete the activity. The critical path represents the project duration. In the example, the critical path is represented by the activities associated with events 1-11-15-19-23-27-29-31. In the example, if activity 7-21 required a time of 10 instead of 8, then the critical path would become 7-21-23-27-29-31, because this sequence of activities would require a longer time. In this case, the receipt of mast arm poles would establish the critical path because they must be received before they can be set in place. |
Date | Last modified: January 23, 2009 |
Source | [1] in Traffic Control Systems Handbook: Chapter 12. Design and Implementation |
Author | United States Department of Transportation - Federal Highway Administration |
Licensing
[edit]Public domainPublic domainfalsefalse |
This work is in the public domain in the United States because it is a work prepared by an officer or employee of the United States Government as part of that person’s official duties under the terms of Title 17, Chapter 1, Section 105 of the US Code.
Note: This only applies to original works of the Federal Government and not to the work of any individual U.S. state, territory, commonwealth, county, municipality, or any other subdivision. This template also does not apply to postage stamp designs published by the United States Postal Service since 1978. (See § 313.6(C)(1) of Compendium of U.S. Copyright Office Practices). It also does not apply to certain US coins; see The US Mint Terms of Use.
|
||
This file has been identified as being free of known restrictions under copyright law, including all related and neighboring rights. |
https://creativecommons.org/publicdomain/mark/1.0/PDMCreative Commons Public Domain Mark 1.0falsefalse
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 10:58, 23 September 2009 | 739 × 638 (74 KB) | Mdd (talk | contribs) | image enlarged | |
09:19, 23 September 2009 | 471 × 403 (38 KB) | Mdd (talk | contribs) | == Summary == {{Information |Description={{en|1=Example of CPM Network Diagram The critical path method (CPM) has proved a successful method for planning, organizing, and controlling projects. Initially, this management tool outlines the project graphica |
You cannot overwrite this file.
File usage on Commons
The following page uses this file:
File usage on other wikis
The following other wikis use this file:
- Usage on ko.wikipedia.org
- Usage on ko.wikiversity.org
- Usage on nl.wikipedia.org
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
_error | 0 |
---|