File:Bundesarchiv Bild 183-S94685, Berlin, Bauarbeiter.jpg
From Wikimedia Commons, the free media repository
Jump to navigation
Jump to search
Size of this preview: 436 × 599 pixels. Other resolutions: 174 × 240 pixels | 582 × 800 pixels.
Original file (582 × 800 pixels, file size: 64 KB, MIME type: image/jpeg)
File information
Structured data
Captions
Summary
[edit]Photographer |
creator QS:P170,Q107981883 |
||||||||||||||||||||||||||
Original caption |
For documentary purposes the German Federal Archive often retained the original image captions, which may be erroneous, biased, obsolete or politically extreme. Berlin, Bauarbeiter
Aufn.: Illus Funck 2 str 5855-50 Guter Auftakt der Bauarbeiter. Auch die Berliner Bauarbeiter können bereits in den ersten Tagen des 3. Leistungswettbewerbs gute Leistungen aufweisen. Die Maurerkolonne Sameisky vollbrachte auf der Baustelle Eissporthalle in der Landsberger Allee eine hervorragende Leistung. Die aus 8 Maurern und 3 Trägern bestehende Kolonne erstellte in diesen Tagen 113,12 cbm Mauerwerk. Das bedeutet eine durchschnittliche Tagesleistung von 4,71 cbm oder 1900 Steinen. - Darüber hinaus erzielte diese Kolonne auch beim Deckenwölben eine sehr gute Leistung. Die Kolonne wölbte in 3 Tagen 416,92 gm, was einer täglichen Arbeitsleistung von 17,37 gm pro Mann entspricht. Auf Grund dieser guten Leistungen, die nur durch eine gute Zusammenarbeit der Kolonne erreicht werden konnte, wurden die Maurer Willy Sameisky, Georg Fraede, Gustav Hanisch und der Träger Willi Maschewski vom Magistratsbauleiter Ensterling ausgezeichnet. UBz: Willi Maschewski. |
||||||||||||||||||||||||||
Depicted place | Berlin | ||||||||||||||||||||||||||
Date |
20 March 1950 date QS:P571,+1950-03-20T00:00:00Z/11 |
||||||||||||||||||||||||||
Collection |
institution QS:P195,Q685753 |
||||||||||||||||||||||||||
Current location |
Allgemeiner Deutscher Nachrichtendienst - Zentralbild (Bild 183) |
||||||||||||||||||||||||||
Accession number | |||||||||||||||||||||||||||
Source |
|
Licensing
[edit]This file is licensed under the Creative Commons Attribution-Share Alike 3.0 Germany license.
Attribution: Bundesarchiv, Bild 183-S94685 / CC-BY-SA 3.0
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 18:23, 4 December 2008 | 582 × 800 (64 KB) | BArchBot (talk | contribs) | == Summary == {{Information |Description={{BArch-description|1='''Berlin, Bauarbeiter''' Aufn.: Illus Funck 2 str 5855-50 Guter Auftakt der Bauarbeiter. Auch die Berliner Bauarbeiter können bereits in den ersten Tagen des 3. Leistungswettbewerbs gute L |
You cannot overwrite this file.
File usage on Commons
The following page uses this file:
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Image title | Aufn.: Illus Funck 2 str 5855-50 Guter Auftakt der Bauarbeiter. Auch die Berliner Bauarbeiter können bereits in den ersten Tagen des 3. Leistungswettbewerbs gute Leistungen aufweisen. Die Maurerkolonne Sameisky vollbrachte auf der Baustelle Eissporthalle in der Landsberger Allee eine hervorragende Leistung. Die aus 8 Maurern und 3 Trägern bestehende Kolonne erstellte in diesen Tagen 113,12 cbm Mauerwerk. Das bedeutet eine durchschnittliche Tagesleistung von 4,71 cbm oder 1900 Steinen. - Darüber hinaus erzielte diese Kolonne auch beim Deckenwölben eine sehr gute Leistung. Die Kolonne wölbte in 3 Tagen 416,92 gm, was einer täglichen Arbeitsleistung von 17,37 gm pro Mann entspricht. Auf Grund dieser guten Leistungen, die nur durch eine gute Zusammenarbeit der Kolonne erreicht werden konnte, wurden die Maurer Willy Sameisky, Georg Fraede, Gustav Hanisch und der Träger Willi Maschewski vom Magistratsbauleiter Ensterling ausgezeichnet. UBz: Willi Maschewski. |
---|---|
Headline | Berlin, Bauarbeiter |
Author | Funck, Heinz |
Credit/Provider | Bundesarchiv |
Short title | Bild 183-S94685 |
Date and time of data generation | 20 March 1950 |
IIM version | 2 |