File:Bundesarchiv Bild 183-75567-0001, VEB Leuna-Werke, Chemiegroßbaustelle.jpg
From Wikimedia Commons, the free media repository
Jump to navigation
Jump to search
Size of this preview: 796 × 600 pixels. Other resolutions: 319 × 240 pixels | 637 × 480 pixels.
Original file (800 × 603 pixels, file size: 67 KB, MIME type: image/jpeg)
File information
Structured data
Captions
Summary
[edit]VEB Leuna-Werke, Chemiegroßbaustelle ( ) | |||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Photographer |
Schmidt |
||||||||||||||||||||||||||
Title |
VEB Leuna-Werke, Chemiegroßbaustelle |
||||||||||||||||||||||||||
Original caption |
For documentary purposes the German Federal Archive often retained the original image captions, which may be erroneous, biased, obsolete or politically extreme. Zentralbild-Schmidt 30.5.1960 Me Chemiegroßbaustelle Leuna II Weitere Fortschritte machen die mächtigen Planierungsarbeiten auf der Großbaustelle im Chemieprogramm, dem Leuna-Werk II, Bez.Halle. Seit ca. 14 Tagen ist die neu errichtete zentrale Mischanlage für Betonstrassen in Betrieb. 150 Meter Betonstrasse (7 Meter Breite und 22 cm Höhe) sind bereits fertiggestellt. Die Straße, die jetzt für den gesamten Transport dient, ist zugleich eine der Hauptstrassen des Werkes. UBz: Kollegen der Maurerbrigaden führen Verbesserungen an der Mischanlage durch. |
||||||||||||||||||||||||||
Depicted place | VEB Leuna-Werke | ||||||||||||||||||||||||||
Date |
30 May 1960 date QS:P571,+1960-05-30T00:00:00Z/11 |
||||||||||||||||||||||||||
Collection |
institution QS:P195,Q685753 |
||||||||||||||||||||||||||
Current location |
Allgemeiner Deutscher Nachrichtendienst - Zentralbild (Bild 183) |
||||||||||||||||||||||||||
Accession number | |||||||||||||||||||||||||||
Source |
|
Licensing
[edit]This file is licensed under the Creative Commons Attribution-Share Alike 3.0 Germany license.
Attribution: Bundesarchiv, Bild 183-75567-0001 / Schmidt / CC-BY-SA 3.0
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 20:20, 9 December 2008 | 800 × 603 (67 KB) | BArchBot (talk | contribs) | == {{int:filedesc}} == {{Information |Description={{BArch-description |comment= <!-- add translations and/or more description --> |biased=<!-- if the original description text is biased, write here why! --> |headline=VEB Leuna-Werke, Chemiegroßbaustelle |
You cannot overwrite this file.
File usage on Commons
The following page uses this file:
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Image title | Zentralbild-Schmidt 30.5.1960 Me Chemiegroßbaustelle Leuna II Weitere Fortschritte machen die mächtigen Planierungsarbeiten auf der Großbaustelle im Chemieprogramm, dem Leuna-Werk II, Bez.Halle. Seit ca. 14 Tagen ist die neu errichtete zentrale Mischanlage für Betonstrassen in Betrieb. 150 Meter Betonstrasse (7 Meter Breite und 22 cm Höhe) sind bereits fertiggestellt. Die Straße, die jetzt für den gesamten Transport dient, ist zugleich eine der Hauptstrassen des Werkes. UBz: Kollegen der Maurerbrigaden führen Verbesserungen an der Mischanlage durch. |
---|---|
Headline | VEB Leuna-Werke, Chemiegroßbaustelle |
Author | Schmidt |
Credit/Provider | Bundesarchiv |
Short title | Bild 183-75567-0001 |
Date and time of data generation | 30 May 1960 |
IIM version | 2 |
Structured data
Items portrayed in this file
depicts
image/jpeg
75bfbc4b14f345f1022b92207d27bfa6a994788c
68,489 byte
603 pixel
800 pixel
Hidden categories: