File:Beach refurbishment at Branksome Chine beach - geograph.org.uk - 118179.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Beach_refurbishment_at_Branksome_Chine_beach_-_geograph.org.uk_-_118179.jpg(640 × 480 pixels, file size: 98 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: Beach refurbishment at Branksome Chine beach. The beach end of the £5million Poole Harbour deep water channel dredging and beach rebuilding project, a 24 hour/7day contract throughout December 2005 and January 2006. This major project has 2 main benefits in refurbishing the Blue Flag award winning beaches providing additional coastal protection and at the same time improving the deep water access for car ferries and commercial shipping into Poole.
Date
Source From geograph.org.uk
Author peter lloyd
Attribution
(required by the license)
InfoField
peter lloyd / Beach refurbishment at Branksome Chine beach / 
peter lloyd / Beach refurbishment at Branksome Chine beach
Camera location50° 42′ 20″ N, 1° 54′ 36″ W Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location50° 42′ 23″ N, 1° 54′ 32″ W Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

[edit]
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: peter lloyd
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.


File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current00:29, 31 January 2010Thumbnail for version as of 00:29, 31 January 2010640 × 480 (98 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Beach refurbishment at Branksome Chine beach. The beach end of the £5million Poole Harbour deep water channel dredging and beach rebuilding project, a 24 hour/7day contract throughout December 2005

There are no pages that use this file.

Metadata