File:Backfilling the bridge - geograph.org.uk - 1615815.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Backfilling_the_bridge_-_geograph.org.uk_-_1615815.jpg(640 × 479 pixels, file size: 112 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: Backfilling the bridge Now that the abutments and central pier for the bridge have been built, the cutting under the bridge has to be backfilled before the bridge deck is erected. This is a safety precaution required to prevent workers falling from the bridge to the bottom of the cutting.
Date
Source From geograph.org.uk
Author Alan Murray-Rust
Attribution
(required by the license)
InfoField
Alan Murray-Rust / Backfilling the bridge / 
Alan Murray-Rust / Backfilling the bridge
Camera location53° 01′ 19″ N, 0° 53′ 36″ W  Heading=247° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location53° 01′ 18″ N, 0° 53′ 38″ W  Heading=247° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

[edit]
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Alan Murray-Rust
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current09:02, 4 March 2011Thumbnail for version as of 09:02, 4 March 2011640 × 479 (112 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Backfilling the bridge Now that the abutments and central pier for the bridge have been built, the cutting under the bridge has to be backfilled before the bridge deck is erected. This is a safety p

There are no pages that use this file.

Metadata