File:ARRA Expand NR. RV Sites 1838 (5863753826).jpg
Original file (2,272 × 1,704 pixels, file size: 834 KB, MIME type: image/jpeg)
Captions
Summary
[edit]DescriptionARRA Expand NR. RV Sites 1838 (5863753826).jpg |
Project: Expand RV Sites to Reduce Overcrowding in Seasonal Employee Quarters. . Project overview: A design/build project to construct six new RV sites and associated infrastructure in the developed area on the North Rim of Grand Canyon National Park.. . Currently, there is a shortage of employee housing within the national park which creates crowded conditions and over extends utilities and other infrastructure. Additionally, the lack of housing makes it difficult for the NPS to recruit seasonal employees or provide temporary housing for volunteers willing to provide valuable assistance to the NPS.. . Project leader: Phil Fessler. . Park contact: Maureen Oltrogge, Public Affairs Officer, (928) 638-7779. . Project timing: The project was announced in June 2010. Construction began in July 2010 and was completed in November 2010.. . ARRA funding: $378,579.. . Partners:. . Accepting outside solicitations: The project was awarded to Ridgway Valley Enterprises, LLC of Montrose, Colorado |
Date | |
Source | ARRA: Expand NR. RV Sites 1838 |
Author | Grand Canyon National Park |
Licensing
[edit]- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
This image was originally posted to Flickr by Grand Canyon NPS at https://flickr.com/photos/50693818@N08/5863753826. It was reviewed on 20 April 2020 by FlickreviewR 2 and was confirmed to be licensed under the terms of the cc-by-2.0. |
20 April 2020
Public domainPublic domainfalsefalse |
This image or media file contains material based on a work of a National Park Service employee, created as part of that person's official duties. As a work of the U.S. federal government, such work is in the public domain in the United States. See the NPS website and NPS copyright policy for more information. |
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 18:02, 20 April 2020 | 2,272 × 1,704 (834 KB) | Killarnee (talk | contribs) | Transferred from Flickr via #flickr2commons |
You cannot overwrite this file.
File usage on Commons
The following page uses this file:
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Camera manufacturer | Canon |
---|---|
Camera model | Canon PowerShot SD700 IS |
Exposure time | 1/200 sec (0.005) |
F-number | f/2.8 |
Date and time of data generation | 09:52, 19 October 2010 |
Lens focal length | 5.8 mm |
Image title | Project: Expand RV Sites to Reduce Overcrowding in Seasonal Employee Quarters
Project overview: A design/build project to construct six new RV sites and associated infrastructure in the developed area on the North Rim of Grand Canyon National Park. Currently, there is a shortage of employee housing within the national park which creates crowded conditions and over extends utilities and other infrastructure. Additionally, the lack of housing makes it difficult for the NPS to recruit seasonal employees or provide temporary housing for volunteers willing to provide valuable assistance to the NPS. Project leader: Phil Fessler Park contact: Maureen Oltrogge, Public Affairs Officer, (928) 638-7779 Project timing: The project was announced in June 2010. Construction began in July 2010 and was completed in November 2010. ARRA funding: $378,579. Partners: Accepting outside solicitations: The project was awarded to Ridgway Valley Enterprises, LLC of Montrose, Colorado |
Orientation | Normal |
Horizontal resolution | 180 dpi |
Vertical resolution | 180 dpi |
File change date and time | 09:52, 19 October 2010 |
Y and C positioning | Centered |
Exif version | 2.2 |
Date and time of digitizing | 09:52, 19 October 2010 |
Meaning of each component |
|
Image compression mode | 2 |
APEX shutter speed | 7.65625 |
APEX aperture | 2.96875 |
APEX exposure bias | 0 |
Maximum land aperture | 2.96875 APEX (f/2.8) |
Metering mode | Pattern |
Flash | Flash did not fire, auto mode |
Supported Flashpix version | 1 |
Color space | sRGB |
Focal plane X resolution | 10,097.777777778 |
Focal plane Y resolution | 10,082.840236686 |
Focal plane resolution unit | inches |
Sensing method | One-chip color area sensor |
File source | Digital still camera |
Custom image processing | Normal process |
Exposure mode | Auto exposure |
White balance | Auto white balance |
Digital zoom ratio | 1 |
Scene capture type | Standard |
IIM version | 2 |