File:2023-07-18 Haltestelle Schwarzsee Bauarbeiten Bahnsteig Gleis 1 (8).jpg
Jump to navigation
Jump to search
Size of this preview: 799 × 600 pixels. Other resolutions: 320 × 240 pixels | 639 × 480 pixels | 1,023 × 768 pixels | 1,280 × 961 pixels | 2,560 × 1,922 pixels | 4,592 × 3,448 pixels.
Original file (4,592 × 3,448 pixels, file size: 7.78 MB, MIME type: image/jpeg)
Categories:
- Haltestelle Schwarzsee
- Side platforms in Austria
- Train station platforms in Tyrol (state)
- Rail transport infrastructure in Tyrol (state)
- Construction of train station platforms in Austria
- Reconstruction (architecture) in Austria
- Construction sites in Tyrol (state)
- Rail tracks in Tyrol (state)
- Construction site fences in Austria
- Metal fences in Austria
- Fences in Tyrol (state)
- Overhead lines in Tyrol (state)
- Train stations in Austria photographed in 2023
- July 2023 in rail construction in Austria
- July 2023 in Tyrol (state)
- 2023 in construction in Tyrol (state)
- Rail construction in Tyrol (state)
- 2023 in rail transport in Tyrol (state)