File:2022 neu gestalteter Bahnübergang und Bahnsteig beim Haltepunkt Dittigheim der Taubertalbahn 4.jpg
Jump to navigation
Jump to search
Size of this preview: 800 × 600 pixels. Other resolutions: 320 × 240 pixels | 640 × 480 pixels | 1,024 × 768 pixels | 1,280 × 960 pixels | 2,560 × 1,920 pixels | 3,648 × 2,736 pixels.
Original file (3,648 × 2,736 pixels, file size: 3.95 MB, MIME type: image/jpeg)
Categories:
- Haltestelle Dittigheim in 2022
- Level crossing at Haltestelle Dittigheim
- August 2022 in rail construction in Main-Tauber-Kreis
- Renovation of Haltestelle Dittigheim
- August 2022 in rail transport in Main-Tauber-Kreis
- Construction sites in Dittigheim
- August 2022 in construction in Tauberbischofsheim
- Train station shelters of Haltestelle Dittigheim
- Metal shelters in Tauberbischofsheim
- Open level crossing barriers in Tauberbischofsheim