File:2018 at Lawrence Hill - relaying main line (03).JPG

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file (1,366 × 910 pixels, file size: 355 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: Looking north from Ducie Road towards Lawrence Hill in 2018 where work is underway to reinstate the two tracks that were remove din 1984.
Date
Source Own work
Author Geof Sheppard

Licensing

[edit]
I, the copyright holder of this work, hereby publish it under the following licenses:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
GNU head Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation; with no Invariant Sections, no Front-Cover Texts, and no Back-Cover Texts. A copy of the license is included in the section entitled GNU Free Documentation License.
You may select the license of your choice.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current11:51, 27 May 2018Thumbnail for version as of 11:51, 27 May 20181,366 × 910 (355 KB)Geof Sheppard (talk | contribs){{Information |Description={{en|1=Looking north from Ducie Road towards Lawrence Hill in 2018 where work is underway to reinstate the two tracks that were remove din 1984.}} |Source={{own}} |Date= 2018-05-03 |Author= Geof Sheppard |Permission= |other_versions= }} 2018-05-03 Category:Lawrence Hill railway station Category:Railway engineering works in England [[Category:2018 in rail transport in the United Kingdom|2018-05...

The following page uses this file:

Metadata