File:2012-06 Grand Canyon National Park Science & RM Building 0053 (7407980772).jpg
Original file (3,872 × 2,592 pixels, file size: 1.56 MB, MIME type: image/jpeg)
Captions
Summary
[edit]Description2012-06 Grand Canyon National Park Science & RM Building 0053 (7407980772).jpg |
June 19, 2012: Construction is now in progress on the park's new Science and Resource Management Facility, near Market Plaza and just south and east of Park Headquarters. Visitors will notice the construction as they pass by the site, but at this time, impacts to park traffic flow will be minimal.. NPS photo by Kristen M. Caldon. Lower floor from the south. . The new facility will be approximately 8,500 square feet, consist of two floors, be universally accessible, and will include employee offices, general work space, meeting space, restrooms, a small public-use library, and storage.. . A new parking area will also be constructed at the facility that will accommodate government vehicles, park staff and those visiting the facility. The new facility is also adjacent to a network of trails and nearby shuttle bus stops that will allow for employees to walk, bike or ride the park shuttle bus to and from work.. . Learn more here: <a href="http://www.nps.gov/grca/parknews/new-location-awaits-science-and-resource-management-facility-in-grand-canyon.htm" rel="nofollow">www.nps.gov/grca/parknews/new-location-awaits-science-and...</a> |
Date | |
Source | 2012-06 Grand Canyon National Park: Science & RM Building 0053 |
Author | Grand Canyon National Park |
Licensing
[edit]- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
This image was originally posted to Flickr by Grand Canyon NPS at https://flickr.com/photos/50693818@N08/7407980772. It was reviewed on 20 April 2020 by FlickreviewR 2 and was confirmed to be licensed under the terms of the cc-by-2.0. |
20 April 2020
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 17:48, 20 April 2020 | 3,872 × 2,592 (1.56 MB) | Killarnee (talk | contribs) | Transferred from Flickr via #flickr2commons |
You cannot overwrite this file.
File usage on Commons
The following page uses this file:
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Camera manufacturer | NIKON CORPORATION |
---|---|
Camera model | NIKON D200 |
Exposure time | 1/400 sec (0.0025) |
F-number | f/7.1 |
ISO speed rating | 200 |
Date and time of data generation | 10:00, 19 June 2012 |
Lens focal length | 24 mm |
Image title | June 19, 2012: Construction is now in progress on the park's new Science and Resource Management Facility, near Market Plaza and just south and east of Park Headquarters. Visitors will notice the construction as they pass by the site, but at this time, impacts to park traffic flow will be minimal.
The new facility will be approximately 8,500 square feet, consist of two floors, be universally accessible, and will include employee offices, general work space, meeting space, restrooms, a small public-use library, and storage. A new parking area will also be constructed at the facility that will accommodate government vehicles, park staff and those visiting the facility. The new facility is also adjacent to a network of trails and nearby shuttle bus stops that will allow for employees to walk, bike or ride the park shuttle bus to and from work. Learn more here: http://www.nps.gov/grca/parknews/new-location-awaits-science-and-resource-management-facility-in-grand-canyon.htm |
Credit/Provider | NPS Photo by Kristen M. Caldon |
Short title | Grand Canyon National Park: Science & RM Building 0053 |
Orientation | Normal |
Horizontal resolution | 240 dpi |
Vertical resolution | 240 dpi |
Software used | Adobe Photoshop CS5 Windows |
File change date and time | 13:04, 19 June 2012 |
Exposure Program | Manual |
Exif version | 2.21 |
Date and time of digitizing | 10:00, 19 June 2012 |
APEX shutter speed | 8.643856 |
APEX aperture | 5.655638 |
APEX exposure bias | 0 |
Maximum land aperture | 3 APEX (f/2.83) |
Subject distance | 3.35 meters |
Metering mode | Spot |
Light source | Unknown |
Flash | Flash did not fire |
DateTime subseconds | 65 |
DateTimeOriginal subseconds | 65 |
DateTimeDigitized subseconds | 65 |
Color space | Uncalibrated |
Sensing method | One-chip color area sensor |
File source | Digital still camera |
Scene type | A directly photographed image |
Custom image processing | Normal process |
Exposure mode | Manual exposure |
White balance | Auto white balance |
Digital zoom ratio | 1 |
Focal length in 35 mm film | 36 mm |
Scene capture type | Standard |
Scene control | None |
Contrast | Hard |
Saturation | High saturation |
Sharpness | Hard |
Subject distance range | Unknown |
Lens used | 24.0-70.0 mm f/2.8 |
Rating (out of 5) | 0 |
Date metadata was last modified | 06:04, 19 June 2012 |
Unique ID of original document | xmp.did:30B298E549BAE11189B7D47C1CB949B3 |