File:170111-A-VX611-11 (31445803674).jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(4,683 × 3,102 pixels, file size: 6.96 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description

Looking upstream at the new auxiliary spillway control structure. These gates sit 50 feet lower than the gates on the main dam, allowing dam operators to release water from Folsom reservoir sooner than they can from the main dam.

The U.S. Army Corps of Engineers Sacramento District continues with the final phase of construction on the Folsom Dam Auxiliary Spillway project January 11, 2017. The project in Folsom, Calif. is scheduled for completion in October 2017.
Date
Source 170111-A-VX611-11
Author U.S. Army Corps of Engineers Sacramento District

Licensing

[edit]
Public domain
This image or file is a work of a U.S. Army Corps of Engineers soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, the image is in the public domain.

English | italiano | Nederlands | پښتو | русский | sicilianu | slovenščina | Türkçe | українська | +/−


This image was originally posted to Flickr by USACE-Sacramento District at https://flickr.com/photos/52057813@N07/31445803674 (archive). It was reviewed on 4 September 2018 by FlickreviewR 2 and was confirmed to be licensed under the terms of the United States Government Work.

4 September 2018

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current19:54, 4 September 2018Thumbnail for version as of 19:54, 4 September 20184,683 × 3,102 (6.96 MB)Tyler ser Noche (talk | contribs)Transferred from Flickr via #flickr2commons

There are no pages that use this file.

Metadata