File:132134 MAIN LOW PRESSURE HEATING LANKERSHAM BOILER PLANT AFTER THE FINAL PHASES OF "OPERATION LEWISITE" WHICH WAS CARRIED OUT UNDER THE DIRECTION OF THE DIRECTOR OF ENGINEERING EQUIPMENT, BCOF.JPG
Jump to navigation
Jump to search
132134_MAIN_LOW_PRESSURE_HEATING_LANKERSHAM_BOILER_PLANT_AFTER_THE_FINAL_PHASES_OF_"OPERATION_LEWISITE"_WHICH_WAS_CARRIED_OUT_UNDER_THE_DIRECTION_OF_THE_DIRECTOR_OF_ENGINEERING_EQUIPMENT,_BCOF.JPG (640 × 413 pixels, file size: 191 KB, MIME type: image/jpeg)