File:132131 MUSTARD GAS PLANT AFTER THE FINAL PHASES OF "OPERATION LEWISITE" WHICH WAS CARRIED OUT UNDER THE DIRECTION OF THE DIRECTOR OF ENGINEERING EQUIPMENT, BCOF.JPG
Jump to navigation
Jump to search
132131_MUSTARD_GAS_PLANT_AFTER_THE_FINAL_PHASES_OF_"OPERATION_LEWISITE"_WHICH_WAS_CARRIED_OUT_UNDER_THE_DIRECTION_OF_THE_DIRECTOR_OF_ENGINEERING_EQUIPMENT,_BCOF.JPG (640 × 412 pixels, file size: 171 KB, MIME type: image/jpeg)